Heat pumps & the BUS grant · Wales

Air source heat pumps in Cardiff.

Air source heat pumps move 3–4× more heat than they use in electricity. Designed properly, a heat pump can lower carbon emissions and may reduce running costs depending on your home, tariff and current heating system. The Boiler Upgrade Scheme gives eligible homes in England and Wales up to £9,000 towards one: £9,000 if you currently heat with oil or LPG, £7,500 if you're on mains gas. The higher rate runs until 31 March 2027. Eligibility is confirmed at survey and the grant is handled through the installer process.

2-minute eligibility check

Tells you instantly which grant applies to your home — £9,000 on oil or LPG, £7,500 on mains gas.

No obligation, no spam. Nigel reads every reply personally.

Gas-Safe registered. Survey-led design, fixed price.

BUS
Grant route Boiler Upgrade Scheme handled for you
80+
Reviews Verified customer reviews

4-step grant + saving estimate

Tells you which grant likely applies — £9,000 on oil or LPG, £7,500 on mains gas — and what you'd typically save a year.

  1. 01

    Property type?

  2. 02

    What heats it now?

  3. 03

    Insulation level?

  4. 04

    Postcode + best contact?

Newly installed black air source heat pump outside a home
How it works

Five things you should know about heat pumps.

01

3–4× more efficient than gas

For every unit of electricity, you get 3–4 units of heat back. Even at today's electricity prices, the running cost is roughly comparable to gas, and as the grid gets greener, that gap widens.

02

Up to £9,000 off the install

The Boiler Upgrade Scheme pays £7,500 towards an air source heat pump, rising to £9,000 if your home currently runs on oil or LPG — that higher rate is available until 31 March 2027. The scheme is claimed through the installer, not by you, so the paperwork never lands on your desk.

03

Works in winter

Modern heat pumps run down to -25°C. The Welsh climate is well within their operating window. Yours will keep running through every cold snap.

04

Quieter than a fridge

Around 40–45 dB at one metre. The modern designs (Vaillant aroTHERM, Mitsubishi Ecodan) are barely audible from inside.

05

Fitted in 2–3 days

Free survey first to size the system properly. The install itself is 2–3 working days for most homes: outdoor unit, indoor cylinder, system commissioning.

From first call to running heat pump.

Six weeks end-to-end for most Cardiff homes. We handle the BUS paperwork; you stay out of it.

  1. 01

    Free survey

    2 hours

    We measure heat loss room-by-room (MCS-method), look at every radiator, check your DHW demand, and check supply size. You get a written design + fixed quote within 5 working days.

  2. 02

    BUS grant application

    3–5 weeks

    The voucher is applied for on your behalf before any work starts, £9,000 if you currently heat with oil or LPG, £7,500 on mains gas. You don't handle the paperwork or fund-and-claim.

  3. 03

    Install day(s)

    3–5 working days

    Outdoor unit on a slab, indoor cylinder fitted, radiators upgraded where needed, pipework re-routed where the old boiler used to live. Always done by Nigel + 1 engineer.

  4. 04

    Commissioning

    1 day

    System filled, vented, balanced, run-in slow. Smart controller paired and walked through with you. Your install certificate and warranty registered on your behalf.

  5. 05

    Ongoing care

    12 months free

    Free first-year service. Free balance-revisit at 3 months once you've lived with it through a full operating cycle. SAP modelling shared so you can see what we predicted vs what you're actually using.

10 vs 20 years

The real cost comparison.

Heat pumps cost more upfront. Over 10 years they're roughly level. Over 20 years they're meaningfully cheaper, and far cleaner. Here's what the math actually looks like for a typical 3-bed Cardiff semi.

Heat pump (after BUS grant) New gas combi
Install (after grant) £6,000 £1,895
Annual running cost (avg.) £1,180 £1,420
Annual service £95 £85
Heat exchanger replacement (year 8–10) £0 £420
10-year total (incl. install) £18,750 £17,945
20-year total (heat pump still running) £31,500 £36,800

Assumes the £7,500 mains-gas rate; on oil or LPG deduct a further £1,500. Based on 12,500 kWh/year typical demand, current Octopus tariffs and MCS-method SAP modelling. Your survey gives you the version specific to your house.

What customers say
★★★★★
We were told by a national installer it'd cost £14,000 and we'd need every radiator replaced. Nigel surveyed properly, said only 3 rads needed upsizing, fitted a Vaillant aroTHERM for £7,200 net of grant. Bills are running about 15% lower than the gas system was, and the house is more comfortable. He showed us the SAP modelling and the actual numbers match.
Tim & Carol R. Whitchurch, CF14 · Verified Google review

Recent heat pump installs.

Five most recent: postcode-level only, no addresses or names.

  • CF14 April

    Whitchurch 4-bed detached. Vaillant aroTHERM 11kW, 3 rad upgrades, £7,200 net.

  • CF64 April

    Penarth bungalow. Mitsubishi Ecodan 8kW, paired with existing UFH, £6,400 net.

  • CF11 March

    Pontcanna Victorian terrace. Heat pump retrofit + UFH whole ground floor, £14,800 net.

  • CF23 March

    Cyncoed semi. Vaillant 7kW, 200L cylinder, like-for-like rads, £6,100 net.

  • CF24 February

    Cardiff Bay 2-bed apartment. Mitsubishi Ecodan 6kW, Permitted Development compliant.

Newly installed black air source heat pump outside a home
Air source heat pumps

A quieter box on the wall, and up to £9,000 off.

Grant paperwork handled for you, and a survey that tells you honestly whether your house suits one.

Heat pump questions

The honest answers.

Does the BUS grant come off the price upfront?

Yes. Your voucher is applied for before any work starts, and the grant is deducted from your final invoice. You don't handle paperwork, you don't fund it and claim back. It's £9,000 if you currently heat with oil or LPG and £7,500 on mains gas. The scheme runs to 2028 (extended by DESNZ), but the higher oil/LPG rate ends on 31 March 2027 and slot availability tightens through the year, so apply early if you can.

Will my radiators need replacing?

Sometimes. Heat pumps run at lower flow temperatures (35–55°C versus a gas boiler's 60–75°C), so older single-panel rads in cold rooms may need upsizing to deliver enough heat. We model every radiator at survey and tell you which ones need to change: usually 3–4 in a 4-bed house, sometimes none in a well-insulated post-2002 build.

Are heat pumps noisy?

Quieter than your fridge. Modern Daikin Altherma and Mitsubishi Ecodan units run at 38–42 dB at 1m, about as loud as a quiet conversation. The unit goes outside on a slab; we measure the boundary noise at survey to confirm Permitted Development sign-off.

Will it actually save me money?

For most Cardiff homes upgrading from a gas boiler, yes: £150–£400 a year on running costs, plus the £7,500 grant on the install. Coming off oil or LPG the case is stronger on both counts — the running-cost gap is wider and the grant is £9,000. Worst-case (poorly insulated home with under-sized rads) is roughly cost-neutral on running but you've still de-fossilised. We'll show you the SAP modelling at survey, not just a glossy sales pitch.

How long does an install take?

3–5 working days on site for a typical 4-bed home, plus a 1-day pre-install survey. We commission and balance the system before we leave; you'll have a smart controller (Mitsubishi MELCloud or similar) walked through with you, and we register your warranty and install certificate on your behalf.

Free survey · No obligation

Want to see if your home qualifies?

Run the 2-minute eligibility check above, or call now and Nigel will talk you through it.

  • Same working day reply
  • Clear pricing before work starts
  • Gas Safe · NICEIC · Checkatrade
Message Nigel on WhatsApp